PART 1 - GENERAL
1.01 Work Included:
Edit acoustical where required
|
- Sprayed cellulose thermal [and acoustical] insulation..
|
| 1.02 Related Items: |
- Clips, hangers, supports, sleeves and other attachments to spray bases are to be placed by other trades prior to the application of sprayed insulation.
- Ducts, piping, conduit or other suspended equipment shall not be positioned until after the application of sprayed insulation.
- Roof penetrations to be installed prior to application.
|
| 1.03 Quality Assurance: |
- Manufacturer must be ISO 9001:2000 Certified.
- Applicator: Licensed by manufacturer.
- Manufacturer must subscribe to independent laboratory follow-up inspection services of Underwriters Laboratories and Factory Mutual. Each bag shall be labeled accordingly.
- Mock up: Apply a 100 square foot representative sample to be reviewed by the Architect and/or Owner prior to proceeding.
|
| 1.04 Submittals: |
- Submit product data and manufacturer's certificate that the product meets or exceeds specified requirements.
- Manufacturer's written certification that product contains no asbestos, fiberglass or other man made mineral fibers.
- Copy of manufacturer's ISO 9001:2000 Certification.
|
| 1.05 Product Delivery, Storage and Handling: |
- Deliver in original, unopened containers bearing name of manufacturer, product identification and reference to U.L. testing.
- Store materials dry, off ground, and under cover.
- Protect liquid adhesive from freezing.
|
PART 2 - PRODUCTS
2.01 Acceptable Manufacturers:
|
- International Cellulose Corporation
12315 Robin Boulevard
Houston, Texas 77045
(713) 433-6701 or (800) 444-1252
FAX: (713) 433-2029
- For approved applicators contact ICC at 800-444-1252.
|
| 2.02 Materials: |
- K-13 Spray-On-Systems.
- Color shall be as indicated in Schedule 3.05.[Color selection will affect price]
- Apply at minimum thickness to provide an R-value(s) as indicated in Schedule 3.05. [Add Thermal Resistance values if applicable]
- Comply with ASTM E-736 for field-tested bond strength; tested @ > 5 years.
- Not less than 400 psf
- Not less than 600 times its weight @ 1"
- Comply with ASTM E-84/U.L. 723, Tested at a minimum of 5" thickness Class 1, Class A
Flame Spread 5
Smoke Development 5
- Comply with local Building Code requirements.
- Comply with ASTM E-1042.
- NRC Rating [Edit NRC rating if applicable]:
Install at a minimum thickness to achieve a NRC rating
as indicated in the Schedule 3.03
| Inches |
125HZ |
250HZ |
500HZ |
1000HZ |
2000HZ |
4000HZ |
NRC |
| K-13 Sprayed Thermal and Acoustical Insulation ASTM C-423 on Solid Backing* |
| 1.00" |
.08 |
.29 |
.75 |
.98 |
.93 |
.96 |
.75 |
| 1.00** |
.47 |
.90 |
1.10 |
1.03 |
1.05 |
1.03 |
1.00 |
| 2.00" |
.26 |
.68 |
1.05 |
1.10 |
1.03 |
.98 |
.95 |
| 3.00 |
.57 |
.99 |
1.04 |
1.03 |
1.00 |
1.00 |
1.00 |
Some values interpolated **On lath
| Inches |
125HZ |
250HZ |
500HZ |
1000HZ |
2000HZ |
4000HZ |
NRC |
| K-13 Sprayed Thermal and Acoustical Insulation Applied at 1.5" Ribbed Metal Deck* |
| 1.5 |
.36 |
.89 |
1.26 |
1.07 |
1.01 |
1.00 |
1.05 |
| 3.00" |
.97 |
1.04 |
1.13 |
.99 |
.95 |
.98 |
1.05 |
Some values interpolated **On lath
- Non corrosive per ASTM C 739.
- Bond Deflection per ASTM E-759: 6" Deflection in 10' Span - No Spalling or Delamination
- Cohesive Strength at time of application per Method WS-2000: > 700 Grams
|
PART 3 - EXECUTION
3.01 Examination
|
- Examine surfaces and report unsatisfactory conditions in writing. Do not proceed until unsatisfactory conditions are corrected.
- Verify surfaces to receive spray insulation to determine if priming/sealing is required to insure bonding and/or to prevent discoloration caused by migratory stains.
|
| 3.02 Preparation |
- Provide masking, drop cloths or other satisfactory coverings for materials/surfaces that are not to receive insulation to protect from over-spray.
- Coordinate installation of the sprayed cellulose fiber with work of other trades.
- Prime surfaces as required by manufacturer's instructions or as determined by examination.
|
| 3.03 Installation |
- Thickness will be determined as the minimum thickness measured as per ASTM E-605 field test procedure.
- Install spray applied insulation according to manufacturerÕs recommendations
- Cure insulation with continuous natural or mechanical ventilation.
- Remove and dispose of over-spray.
|
| 3.04 Protection |
- Protect finished installation under provision of Division 1
|
| 3.05 Schedule |
Provide a schedule when insulation requires listing by color, insulation value, NRC values and attributes.
|